The plan for development and operation (PDO) was submitted in May 2022 and includes five subsea templates that will be tied back to the existing infrastructure on the Åsgard field.

Equinor Energy AS is operator and owns 57.7%, whereas Vår Energi ASA, Sval Energi AS and Petoro own 24.6%, 11.8% and 5.9%, respectively.