Maria Phase 2
Non-operated
The Maria Phase 2 project involves installation of a new six-slot template and four new wells, in the southern part of the Maria field, located about 200 kilometres off the coast of Norway. Maria, which is a subsea field originally developed with two templates, came on stream in 2017. This next phase of the Maria project is expected to add around 27 million barrels of oil equivalent to the total field reserves. Maria Phase 2 is planned for start-up in 2025.Expected lifetime of the Maria field is until 2040.
The Maria Phase 2 project involves installation of a new six-slot template and four new wells, in the southern part of the Maria field, located about 200 kilometres off the coast of Norway. Maria, which is a subsea field originally developed with two templates, came on stream in 2017. This next phase of the Maria project is expected to add around 27 million barrels of oil equivalent to the total field reserves. Maria Phase 2 is planned for start-up in 2025.Expected lifetime of the Maria field is until 2040.
Partners:
Sval Energi AS (20%)
Wintershall Dea Norge (50%, operator)
Petoro (30%)